crowded patio space as demo begins with concrete and old plants coming out.
|
old concrete patio and over grown laurel bushes with rotten timber walls.
|
before
|
|
unusable space with old garden items.
|
site is cleared of old debris and graded. Top retaining wall begins construction.
|
after
|
|
15 tons of blue/gold basalt is delivered to start rockery.
|
rockery constructed and lower wall and patio grade begins construction.
|
|
|
rockery constructed to flow with natural grade going up hill.
|
construction of bottom patio walls start, with honey quartzite ledge stone.
|
|
|
10 tons of honey ledge stone being stacked by hand.
|
dry stacked quartzite stone wall.
|
|
|
|
building of secondary stone wall begins.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|